Categories : Portofolio

 

PLTMH Leuwi Kiara – Cipatujah – Tasikmalaya,Jawa Barat
Mulai Beroperasi Desember 2003,Propeler Open Flume Ø430,Head: 4.5 M – Flow: 500  l/s,Power Output: 1 x 11.000 watt

Spread the Word, like or share this page, your friends will also love it and thanks for it.

 Posted on : October 25, 2010

Leave a Comment

Your email address will not be published. Required fields are marked by *.